94 SERIES BOILER
SUGGESTED SPECIFICATIONS
I.
General Requirements
A. Furnish and install ( ) low pressure, wet base, cast iron sectional boiler(s) with power
burner(s) that pressurize the firebox and operate under forced and balanced draft.
B. Assemble and install boiler-burner unit(s) in compliance with manufacturers installation
instructions. All work must be done in a neat and workman like manner.
C. Weil-McLain (P)(A)(B) L, (P)(A)(B) G, (P)(A)(B) GL- ( )94-(W) (S)F boiler(s) with
burner(s) capable of burning natural gas at ( )” W.C. inlet pressure and/or No. 2 fuel oil.
1. (B) Boiler-burner unit Field assembled (standard).
2. (A) Boiler-burner unit with factory assembled sections (to size 21 only).
3. (P) Boiler-burner unit completely packaged and fire tested (to size 21 only).
4. Natural gas fired and/or No. 2 fuel oil.
5. Water or steam.
6. Forced or balanced draft.
D. Boiler(s) shall have I=B=R Hydronics Institute gross output(s) at 100% firing rate –
( ) MBH per boiler.
E. Boiler(s) shall be manufactured by ISO 9001 registered company to conform to Section
IV of the ASME Boiler and Pressure Vessel Code.
1. Individual sections (and section assembly) to be hydrostatically pressure tested at
factory in accordance with ASME requirements.
2. Maximum allowable working pressure 50 PSIG water and 15 PSIG steam cast as
part of section with ASME symbol (Water only: optional 80 PSIG stamped in
section in place of 50 PSIG).
F. Regulatory Requirements
1. Boiler(s) and controls to comply with applicable regulations.
2. Provide UL labeled burner(s).
3. Provide add option for local code(s) ie: MASS Code BAR
G. Submittals
1. Submit shop drawings and product data.
2. Submittal packet to include boiler (and burner) manufacturer descriptive literature,
installation instructions, operating instructions, and maintenance instructions.
II.
Product
A. Acceptable boiler/burner manufacturer(s) include(s):
1.Weil-McLain only, as specified in Part 1, Paragraph C.
1
•
Shipped with insulated heavy gauge steel jacket(s) with durable powdered
paint enamel finish. Jacket designed to be installed after connecting supply and
return piping.
D. Tankless heaters or indirect water heaters
•
Provide ( ) internal tankless water heater(s) inserted into the right hand side
of the tankless intermediate (TI) section in the opening provided. Allow 44”
minimum clearance on right side of boiler for cleaning and servicing. Tankless
openings must be on same side as the flue passage cleanout plates to
minimize space requirements.
E. Boiler foundation(s):
Installer to construct needed support and level concrete foundation(s) where
boiler room floor is uneven or will not support the weight of the boiler(s).
•
F.
Boiler trim:
1. All electrical components to be of high quality and bear the UL label.
a) Water boiler(s) controls furnished:
1) Combination low temperature limit (operating) and high temperature limit
control.
2) Low temperature limit set according to system design. High temperature
limit set at least 20°F higher than the low limit (240°F is the maximum
allowable water temperature).
3) Combination pressure-temperature gauge with dial clearly marked and
easy to read.
4) ASME certified pressure relief valve, set to relieve at 30 PSIG. Optional
relief valves available up to and including maximum allowable pressure.
Side outlet discharge type; contractor to pipe outlet to floor drain or near
floor, avoiding any area where freezing could occur.
b) Steam boiler(s) standard controls furnished:
1) Low pressuretrol (operating) and high pressuretrol set at maximum
pressure as a safety control.
2) Steam pressure gauge with dial clearly marked and easy to read.
3) Gauge cock water set with gauge glass, guards and aluminum water level
plate.
4) ASME certified pressure relief valve, set to relieve at 15 PSIG. Side outlet
discharge type; contractor to pipe outlet to floor drain or near floor,
avoiding any area where freezing could occur.
c) Low water cut-off for water or steam boiler(s):
1) Boiler(s) to be furnished with UL labeled low water cut-off with ASME
working pressure rating equal to the ASME rating of the relief valve.
2) Do not use quick-connect fittings on boiler(s).
3) Install cut-off according to manufacturer’s instructions.
4) Locate so burner shuts down if boiler water level falls below allowable
safe waterline (steam boilers, ¼” above bottom of gauge glass).
5) Steam boiler primary low water cut-off shall be a float type – auto reset.
3
6) Steam boiler secondary low water cut-off shall be a float type – manual
reset.
III.
Burner(s) construction, features and requirements:
1. Burner fuel supply system and burner installation to conform to burner
manufacturer’s installation instructions and applicable codes.
2. Burner motor characteristics: 120/60/1, 240/60/1, 208/60/3,
240/60/3, 480/60/3.
3. Control characteristics 120/60/1.
4. Burner fuel – natural gas 4.0” W.C. minimum, No. 2 fuel oil.
5. Code(s) - standard boiler, CSD-1, FM, IRI
6. Burner(s) to have UL label(s) supplied by the burner manufacturer.
7. Burner(s) designed to ensure high efficiency and good performance under
forced draft conditions with 0.1” W.C. positive pressure at the flue collar.
8. Burner to be adjusted to provide 9.5 to 10.0% CO2 for gas and/or 11.5 to 12%
CO2 with zero smoke for oil firing.
9. Burner(s) manufactured by: Power-Flame, Gordon-Piatt.
10. Burner operating mode: on-off, low-high-off, low-high-low,
modulating
A. Panel options – power on/fuel on light is standard on all burner(s) with panels.
1) Call For Heat
2) Ignition On
3) Pilot Failure
4) Low Water
5) Flame Failure
6) Silencing Switch
7) Control Fuse and Holder
8) Post Purge Timer
9) Alarm Bell
B. Start-up and Service
•
The contractor shall obtain the services of a factory authorized agent to provide
burner light-off and adjustment. The start-up agent shall provide a burner light-
off report as written proof that the burner was adjusted to optimum
performance.
•
Authorized: The agent shall provide a one year service warranty after start-up.
Weil-McLain
500 Blaine Street
Michigan City, IN 46360-2388
4
C-810(699)
|